5 ton oil fired boiler delivery to indonesia

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :5 ton oil fired boiler delivery to indonesia
  • Supply Capacity : 10 units/month :5 ton oil fired boiler delivery to indonesia
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    84 ME Board Problem An oil heater heats 100 kg per minute of oil from 35oC to 100oC in a counterflow heat exchanger. The average specific heat of the oil is 2.5 kJ/kgoC. Exhaust gases used for heating enter the heater with an average specific heat of 1 kJ/kgoC, a mass flow rate of 250 kg/min and an initial temperature of 200oC.Get Price

  • Steam locomotive - Wikipedia

    A steam locomotive is a rail vehicle that provides the force to move itself and other vehicles by means of the expansion of steam.: 80 It is fuelled by burning combustible material (usually coal, oil or – now rare – wood) to heat water in the locomotive's boiler to the point when it becomes gaseous and its volume increases 1,700 times. . Functionally, it is a steam engiGet Price

  • Steam locomotive - Wikipedia

    A steam locomotive is a rail vehicle that provides the force to move itself and other vehicles by means of the expansion of steam.: 80 It is fuelled by burning combustible material (usually coal, oil or – now rare – wood) to heat water in the locomotive's boiler to the point when it becomes gaseous and its volume increases 1,700 times. . Functionally, it is a steam engiGet Price

  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    84 ME Board Problem An oil heater heats 100 kg per minute of oil from 35oC to 100oC in a counterflow heat exchanger. The average specific heat of the oil is 2.5 kJ/kgoC. Exhaust gases used for heating enter the heater with an average specific heat of 1 kJ/kgoC, a mass flow rate of 250 kg/min and an initial temperature of 200oC.Get Price

  • Power station - Wikipedia

    By heat source. Fossil-fuel power stations may also use a steam turbine generator or in the case of natural gas-fired power plants may use a combustion turbine.A coal-fired power station produces heat by burning coal in a steam boiler. The steam drives a steam turbine and generator that then produces electricity.The waste products of combustion include ash, sulfur dioxide, …Get Price

  • Plant Resource Manager (PRM) | Yokogawa Electric Corporation

    Steady boiler control by CENTUM CS 3000 with dual redundant CPUs and seven 9s availability; comprising four 660MW coal-fired units. The power station has operated reliably since 1981. To ensure continued reliability for the next few decades, Eraring Energy, the owner of the power plant, decided to replace the original hard-wired control Get Price

  • Power station - Wikipedia

    By heat source. Fossil-fuel power stations may also use a steam turbine generator or in the case of natural gas-fired power plants may use a combustion turbine.A coal-fired power station produces heat by burning coal in a steam boiler. The steam drives a steam turbine and generator that then produces electricity.The waste products of combustion include ash, sulfur dioxide, …Get Price

  • Steam locomotive - Wikipedia

    A steam locomotive is a rail vehicle that provides the force to move itself and other vehicles by means of the expansion of steam.: 80 It is fuelled by burning combustible material (usually coal, oil or – now rare – wood) to heat water in the locomotive's boiler to the point when it becomes gaseous and its volume increases 1,700 times. . Functionally, it is a steam engiGet Price

  • Power station - Wikipedia

    By heat source. Fossil-fuel power stations may also use a steam turbine generator or in the case of natural gas-fired power plants may use a combustion turbine.A coal-fired power station produces heat by burning coal in a steam boiler. The steam drives a steam turbine and generator that then produces electricity.The waste products of combustion include ash, sulfur dioxide, …Get Price

  • Plant Resource Manager (PRM) | Yokogawa Electric Corporation

    Steady boiler control by CENTUM CS 3000 with dual redundant CPUs and seven 9s availability; comprising four 660MW coal-fired units. The power station has operated reliably since 1981. To ensure continued reliability for the next few decades, Eraring Energy, the owner of the power plant, decided to replace the original hard-wired control Get Price

  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    84 ME Board Problem An oil heater heats 100 kg per minute of oil from 35oC to 100oC in a counterflow heat exchanger. The average specific heat of the oil is 2.5 kJ/kgoC. Exhaust gases used for heating enter the heater with an average specific heat of 1 kJ/kgoC, a mass flow rate of 250 kg/min and an initial temperature of 200oC.Get Price

  • Plant Resource Manager (PRM) | Yokogawa Electric Corporation

    Steady boiler control by CENTUM CS 3000 with dual redundant CPUs and seven 9s availability; comprising four 660MW coal-fired units. The power station has operated reliably since 1981. To ensure continued reliability for the next few decades, Eraring Energy, the owner of the power plant, decided to replace the original hard-wired control Get Price

Discount
7X24 Online